SWIFT 50 GLP Sensors Installation
64
Road Simulator
Installing the Transducer
D. Secure the cables to the lateral strut of the road simulator so that it will
not become damaged during testing.
Be sure to leave enough slack for the full range of movement of the
simulation fixture.
10. Connect the power supply (12 V DC or optional 24 V DC) to the TI.
You may need to first convert from 120 or 240 V AC to 12 V DC or 24 V
DC.
11. Connect the six data cables from the TI to the data recorder or your test
control system.
There is one cable per channel of data from the TI to the data recorder.
Komentáře k této Příručce