Strany 1 - Site Preparation Guide

be certain.mLandmark Testing SystemsSite Preparation Guide100-209-144 C

Strany 2 - Publication information

Landmark Test System Site Prep Guide10Facility PreparationGrounding RequirementsEach system has its own internal grounding system, which is common gro

Strany 3 - Contents

Landmark Test System Site Prep Guide Facility Preparation11AcousticsSome types of fatigue testing can produce noise which is undesirable or potentiall

Strany 4

Landmark Test System Site Prep Guide12Facility PreparationRelative HumidityThe recommended relative humidity for the test room is within the range of

Strany 5 - Introduction

Landmark Test System Site Prep Guide System Component Specifications13System Component SpecificationsContents Load Unit Specifications 14Hydraulic

Strany 6

Landmark Test System Site Prep Guide14Load Unit SpecificationsSystem Component SpecificationsLoad Unit Specifications

Strany 7 - Facility Preparation

Load Unit SpecificationsLandmark Test System Site Prep Guide System Component Specifications15

Strany 8 - Foundation Requirements

Landmark Test System Site Prep Guide16Load Unit SpecificationsSystem Component Specifications

Strany 9 - Electrical Power Distribution

Hydraulic Power Unit SpecificationsLandmark Test System Site Prep Guide System Component Specifications17Hydraulic Power Unit SpecificationsThe follow

Strany 10 - Radiated Emissions

Landmark Test System Site Prep Guide18Hydraulic Power Unit SpecificationsSystem Component SpecificationsModel 505.07/.11 SpecificationsGeneral Specifi

Strany 11 - Altitude

Hydraulic Power Unit SpecificationsLandmark Test System Site Prep Guide System Component Specifications19Model Specific SpecificationsParameter 505.07

Strany 12 - Relative Humidity

Copyright information © 2012 MTS Systems Corporation. All rights reserved.Trademark information MTS is a registered trademark of MTS Systems Corporati

Strany 13

Landmark Test System Site Prep Guide20Hydraulic Power Unit SpecificationsSystem Component SpecificationsModel 505.20/.30 SpecificationsGeneral Specifi

Strany 14 - Load Unit Specifications

Hydraulic Power Unit SpecificationsLandmark Test System Site Prep Guide System Component Specifications21Model Specific SpecificationsParameter 505.20

Strany 15

Landmark Test System Site Prep Guide22Controller SpecificationsSystem Component SpecificationsController SpecificationsEnvironmental Requirements—Seri

Strany 16

Controller SpecificationsLandmark Test System Site Prep Guide System Component Specifications23Specifications–Model 494.04 Chassis All equipment relat

Strany 17

Landmark Test System Site Prep Guide24Controller SpecificationsSystem Component SpecificationsSpecifications–Model 494.06 Chassis All equipment relate

Strany 18 - Parameter Specification

Controller SpecificationsLandmark Test System Site Prep Guide System Component Specifications25Specifications–Model 494.10 ChassisAll equipment relate

Strany 19 - Model Specific Specifications

Landmark Test System Site Prep Guide26Controller SpecificationsSystem Component SpecificationsSpecifications–Model 494.20 Chassis All equipment relate

Strany 20 - at 50/60 Hz

Landmark Test System Site Prep Guide Additional Considerations27Additional ConsiderationsContents HPU Considerations 28Load Unit Considerations

Strany 21

Landmark Test System Site Prep Guide28HPU ConsiderationsAdditional ConsiderationsHPU ConsiderationsHPU Cooling Water RequirementsThe hydraulic power u

Strany 22 - Controller Specifications

HPU ConsiderationsLandmark Test System Site Prep Guide Additional Considerations29Softened or distilled water might not be good to use as a cooling li

Strany 23

Landmark Test System Site Prep Guide Contents3ContentsIntroduction 5Facility Preparation 7Preparing to Receive the System 7Space Requirements

Strany 24

Landmark Test System Site Prep Guide30Load Unit ConsiderationsAdditional ConsiderationsLoad Unit ConsiderationsThe load unit is typically shipped in a

Strany 25

Electronic Console ConsiderationsLandmark Test System Site Prep Guide Additional Considerations31Electronic Console ConsiderationsConsole Handling Req

Strany 26

Landmark Test System Site Prep Guide32Computer Console ConsiderationsAdditional ConsiderationsComputer Console ConsiderationsPackaging and movement of

Strany 28 - HPU Considerations

mMTS Systems Corporation14000 Technology DriveEden Prairie, Minnesota 55344-2290 USAToll Free Phone: 800-328-2255 (within the U.S. or Canada)Phone: 95

Strany 29

Landmark Test System Site Prep Guide4ContentsAdditional Considerations 27HPU Considerations 28HPU Cooling Water Requirements 28HPU Electrical

Strany 30 - Load Unit Considerations

Landmark Test System Site Prep Guide Introduction5IntroductionThe MTS Landmark System is designed to operate in a laboratory or light industry environ

Strany 31 - Console Handling Requirements

Landmark Test System Site Prep Guide6Introduction

Strany 32 - When You Get Your System

Landmark Test System Site Prep Guide Facility Preparation7Facility PreparationThis section describes the physical, electrical, and mechanical requirem

Strany 33

Landmark Test System Site Prep Guide8Facility PreparationSpace RequirementsConsideration must be given to planning the space requirements around the e

Strany 34

Landmark Test System Site Prep Guide Facility Preparation9The dynamic response characteristics of the foundation should be limited to low levels so th