C. Connect the cables from the Shunt A and Shunt B connectors on the
connector housing or the slip-ring bracket to the Shunt A and Shunt B
connectors on the TI box(es)
D. Secure the cables to the lateral strut of the road simulator so that it will
not become damaged during testing.
Be sure to leave enough slack for the full range of movement of the
simulation fixture.
10. Connect the power supply (12 V DC or optional 24 V DC) to the TI.
You might need to first convert from 120 or 240 V AC to 12 V DC or 24 V
DC.
11. Connect the data cables from the TI to the data recorder or your test control
system. There is one cable per channel of data from the TI to the data
recorder.